The operational and service-improvement experience of the 100a railway line

Authors

  • Zsolt Márton Csaba Építési és Közlekedési Minisztérium

DOI:

https://doi.org/10.24228/KTSZ.2025.1.2

Keywords:

100a railway line, railway rolling stock, timetable, track renovation, railway operation

Abstract

The 100a (Budapest-Cegléd-Szolnok) railway line is the most used railway line regarding passanger numbers. The state of the railway line posed several problems for both the operator and passanger service railway companies. Due to several smaller and bigger steps the punctiality of the line improved and the level of service was raised: reallocation of train types, partial track reconstruction, operational changes. The basic punctuality datas are not sufficient to measure the overall service level and operational problems. There are several types of data that can be used instead to help the professional staff of railway companies to analyse.

References

Downloads

Published

2025-02-11

How to Cite

Csaba, Z. M. (2025). The operational and service-improvement experience of the 100a railway line. Scientific Review of Transport, 75(1), 18–27. https://doi.org/10.24228/KTSZ.2025.1.2

Issue

Section

Railway Transportation